Residents meet to discuss Bay Outlet Bridge
By: WROC-TV
Updated: October 26, 2007

It's a sign of the changing seasons...the opening of the
Currently the driver's bridge opens on November first, and it will stay open until April first when boaters take to the waters. At a public hearing in Webster, State Assemblyman David Koon says there is a perfect solution...updating the bridge. The problem...the cost.
"If the people in Webster want it as much as the people in
Koon says if a motor were installed, the bridge could be lifted and let back down within minutes.


